Civilcon designed a 120 feet clear span bridge replacement and also raised the roadway elevation to alleviate frequent flooding. Civilcon was able to perform preliminary engineering, obtain all required permits and provide final plans and bid documents in less than 12 months to enable this project's completion in an accelerated fashion. Project features include roadway approach improvements, rapid superstructure installation, and special permitting concessions.